Asite allows privileged users to execute many ready to use standard reports. Users also have ability to duplicate these ready to use reports post which they can modify them as required.
List of Ready to Use Reports
Sr. No. | Report Name | Description |
1 | Comment Tracker | Displays all the aMessages made on the documents in separate rows. |
2 | Comments Report | Gives the list of aMessages and the name of user who created it along with the date. Fields shown in the report - 'Project Name', 'Doc Ref', 'Comment Creator', 'Purpose of Issue', 'Issue No', 'Publish Date', 'Comment Details', 'Comment Title', 'Comment Date', 'Distribution', 'Doc Status', 'Document Title', 'File Name', 'Folder Name', 'Has Markup', 'Last Updated', 'Private Comment'. |
3 | Dashboard Report - File Tasks Past 12 Months | Gives a dashboard view of file tasks for the past 12 months, further filtered by 'Project', 'Recipient Task', 'Month-Year', 'Recipient' and 'Recipient Organization'. |
4 | Dashboard Report - Forms Created Past 12 Months | Gives a dashboard view of forms created for the past 12 months. The filters are broadly divided into two categories viz. 'Form Created' and 'Form Closed', further filtered by 'Project', 'Form Status', 'Form Type', 'User', 'Recipient Task', 'Month-Year', 'Recipient' and 'Recipient Organization'. |
5 | Dashboard Report - Forms Status Summary | Gives a dashboard view of summary of form statuses. Further, the report tells you the number of days an form has been open. |
6 | Dashboard Report - Forms Tasks Past 12 Months | Gives a dashboard view of form tasks for the past 12 months. The filters are broadly divided into two categories viz. 'Form Task Assigned' and 'Form Task Completed', further filtered by 'Project', 'Form Status', 'Form Type', 'Recipient Task', 'Month-Year', 'Recipient' and 'Recipient Organization'. |
7 | Dashboard Report - New User Added Past 12 Months | Gives a dashboard view of new users added in past 12 months. The report is split into trend reports grouped by project and organisation as well as numbers in months and organisation. Filters are available for 'Project', 'Month-Year' and 'Organisation'. |
8 | Dashboard Report - Project Activity | Gives a dashboard view of multiple bar charts based on project activity viz. 'Files Uploaded', 'Comment Created', 'Files Task Assigned', 'Files Task Completed', 'Forms Created', 'Forms Closed', 'Forms Task Assigned' and 'Forms Task Completed' and grouped by 'Previous Day', 'Past Week', 'Past Month', 'Past 6 months' and 'Overall'. |
9 | Dashboard Report - Publisher Statistics Past 12 Months | Gives a dashboard view of publishing statistics. The dashboard contains upload trend chart for past 12 months per project and organization. Also incorporated are monthly chart for number of files published and a chart showing organization wise upload. Further there is a chart for number of files published per user. |
10 | Document Issue Record | Gives the list of latest documents and the name of user to whom it was issued along with the date. |
11 | Document Issue Sheet | Shows distribution history of the documents. |
12 | Document Submission Schedule Report | Shows the detailed status of placeholders created and files uploaded on them in a project along with its latency. |
13 | Extended Attributes List | Shows the details of additional attributes added in a project. |
14 | File Tasks Assigned - Group by Month in Past 12 Months (Chart) | Shows files task assigned - project trend past 12 months grouped by month. |
15 | File Tasks Assigned - Group by Organization in Past 12 Months (Chart) | Shows files task assigned - project trend past 12 months grouped by organization. |
16 | File Tasks Assigned - Organization-wise Trend in Past 12 Months (Chart) | Shows files task assigned - project trend past 12 months organization-wise. |
17 | File Tasks Assigned - Project-wise Trend in Past 12 Months (Chart) | Shows files task assigned - project trend past 12 months. |
18 | File Tasks Completed - Group by Month in Past 12 Months (Chart) | Shows files task completed - project trend past 12 months grouped by month. |
19 | File Tasks Completed - Group by Organization in Past 12 Months (Chart) | Shows files task completed - project trend past 12 months grouped by organization. |
20 | File Tasks Completed - Organization-wise Trend in Past 12 Months (Chart) | Shows files task completed - project trend past 12 months organization-wise. |
21 | File Tasks Completed - Project-wise Trend in Past 12 Months (Chart) | Shows files task completed - project-wise trend past 12 months. |
22 | File Tasks Completed Latency - Organization-wise Trend in Past 12 Months (Chart) | Shows organization wise latency chart for file task completion for past 12 months. |
23 | File Tasks Completed Latency - Project-wise Trend in Past 12 Months (Line Chart) | Shows project wise latency chart for file task completion for past 12 months. |
24 | Files - Document Distribution | Gives a detailed transmittal report of all tasks for the selected projects including user's job title. |
25 | Files - Export | Exports a list of files with standard metadata. |
26 | Files - Export Last 12 Months | Gives basic file meta-data export of last 12 months for the selected projects. |
27 | Files - Organizations - Incomplete tasks (Chart) | Displays a pie chart with number of incomplete tasks of organizations for the selected projects. |
28 | Files - Organizations - Overdue tasks (Chart) | Displays a pie chart with number of overdue tasks of organizations for the selected projects. |
29 | Files - Organizations - Tasks Summary (Chart) | Displays a stack column chart with overall task status of organizations for selected projects. |
30 | Files - Organizations - Tasks assigned (Chart) | Displays a pie chart with number of tasks assigned to organizations for the selected projects. |
31 | Files - Organizations - Tasks completed (Chart) | Displays a pie chart with number of tasks completed by organizations for the selected projects. |
32 | Files - Project-wise Cumulative File Size (Bar Chart) | Shows cumulative size of files in MB’s. |
33 | Files - Project-wise Cumulative File Size (Chart) | Shows cumulative size of files in MB’s. |
34 | Files - Publisher Statistics (Chart) | Shows below details: |
35 | Files - Secondary File Change History | Gives detailed history of change in secondary file (attachment) for a document. |
36 | Files - Status Changed By Organization (Chart) | Displays a pie chart with number of status changed by organizations for the selected projects. |
37 | Files - Status Changed by User (Chart) | Displays a column chart with number of status changes by users for the selected projects. |
38 | Files - Status History Report | Gives detailed history of file status change for the selected projects. |
39 | Files - Tasks - Incomplete (Chart) | Displays a pie chart with number of incomplete tasks by task type for the selected projects. |
40 | Files - Tasks - Overdue (Chart) | Displays a pie chart with number of overdue tasks by task type for the selected projects. |
41 | Files - Tasks Status - (Chart) | Displays a pie chart with overall task status i.e. count of all incomplete, overdue or cleared tasks for the selected project. |
42 | Files - Transmittal Log - Task Assigned Previous Day | Gives detailed transmittal report of tasks assigned previous day for the selected projects. |
43 | Files - Transmittal Log - All Tasks | Gives detailed transmittal report of all tasks for the selected projects. |
44 | Files - Transmittal Log - Incomplete Tasks | Gives detailed transmittal report of incomplete tasks for the selected projects. |
45 | Files - Transmittal Log - Overdue Tasks | Gives detailed transmittal report of overdue tasks for the selected projects. |
46 | Files - Users - Incomplete tasks (Bar Chart) | Displays a pie chart with number of incomplete tasks of users for the selected projects. |
47 | Files - Users - Overdue tasks (Bar Chart) | Displays a pie chart with number of overdue tasks of users for the selected projects. |
48 | Files Published Group by Month in Past 12 Months (Bar Chart) | Gives bar chart view for monthly total number of uploads for all the selected projects. |
49 | Files Published Group by Organization in Past 12 Months (Bar Chart) | Gives bar chart view for total number of uploads in the last 12 months per organization for all the selected projects. |
50 | Files Published Group by Users in Past 12 Months (Bar Chart) | Gives bar chart view for total number of uploads in the last 12 months per user for all the selected projects. |
51 | Files Status Change - Past 12 Months | Gives an account of the status changed for a document in the past 12 months. |
52 | Files Task Status Summary - Past 12 Months (Chart) | Shows the status of files task assigned, task completed late and task completed on time. |
53 | Files Transmittal - Lead Time for Past 12 Months | Gives you the transmittal register and the status of the tasks on the files with their latency. |
54 | Files Transmittal - Tasks Completed Past 12 Months | Gives you the transmittal register along with the latency of the completed tasks. |
55 | Files and Forms Task Status Summary - Past 12 Months - (Bar Chart) | Shows the number of tasks that were assigned and the count of tasks that were completed on time and count of tasks that were completed late. |
56 | Files by Publisher - Pie Chart | Shows the count of files grouped by publisher in a pie chart. |
57 | Files by Publisher Org - Pie Chart | Shows the count of files grouped by publishing organization in a pie chart. |
58 | Files by Purpose - Pie Chart | Shows the count of files grouped by purpose of issue in a pie chart |
59 | Files by Status - Pie Chart | Shows the count of files grouped by file status in a pie chart. |
60 | Folder Attribute Sets | Exports a list of folders along with the name of attribute set applied to that folder. |
61 | Form Association Report | Displays information about forms having document associations. |
62 | Form Distribution - Lead time | Gives form register report with lead time for 'Respond' Task. |
63 | Form Tasks - Incomplete - (Chart) | Displays a pie chart with number of incomplete tasks by task type of forms for the selected projects. |
64 | Form Tasks - Overdue - (Chart) | Displays a pie chart with number of overdue tasks by task type of forms for the selected projects. |
65 | Form Tasks Assigned - Group by Month in Past 12 Months (Chart) | Shows forms task assigned - project trend past 12 months grouped by month. |
66 | Form Tasks Assigned - Group by Organization in Past 12 Months (Chart) | Shows forms task assigned - project trend past 12 months grouped by organization. |
67 | Form Tasks Assigned - Organization-wise Trend in Past 12 Months (Chart) | Shows forms task assigned - project trend past 12 months organization-wise. |
68 | Form Tasks Assigned - Project-wise Trend in Past 12 Months (Chart) | Shows forms task assigned - project trend past 12 months. |
69 | Form Tasks Completed - Group by Month in Past 12 Months (Chart) | Shows forms task completed - project trend past 12 months grouped by month. |
70 | Form Tasks Completed - Group by Organization in Past 12 Months (Chart) | Shows forms task completed - project trend past 12 months grouped by organization. |
71 | Form Tasks Completed - Organization-wise Trend in Past 12 Months (Chart) | Shows forms task completed - project trend past 12 months organization-wise. |
72 | Form Tasks Completed - Past 12 Months | Shows if the task assigned on a form was completed on time or not. |
73 | Form Tasks Completed - Project-wise Trend in Past 12 Months (Chart) | Shows forms task completed - project trend past 12 months. |
74 | Form Tasks Completed Latency - Organization-wise Trend in Past 12 Months (Chart) | Shows organization wise latency chart for form task completion for past 12 months. |
75 | Form Tasks Completed Latency - Project-wise Trend in Past 12 Months (Chart) | Shows project wise latency chart for form task completion for past 12 months. |
76 | Form Tasks - All - (Chart) | Displays a pie chart with number of tasks by task type of forms for the selected projects. |
77 | Forms - By Form Type (Chart) | Displays a pie chart of forms as per form type i.e. count of forms created as per each form type for the selected project. |
78 | Forms - By Organization (Chart) | Displays a pie chart of forms created by organization i.e. count of forms created by each organization for the selected project. |
79 | Forms - By Status (Chart) | Displays a pie chart of forms as per current status i.e. count of forms created by each status for the selected project. |
80 | Forms - Distribution Report - All Tasks | Gives detailed distribution report of all tasks for the selected projects. |
81 | Forms - Distribution Report - Incomplete Tasks | Gives detailed distribution report of incomplete tasks for the selected projects. |
82 | Forms - Distribution Report - Incomplete Respond Tasks | Gives detailed distribution report of incomplete 'Respond' tasks for the selected projects. |
83 | Forms - Distribution Report - Incomplete Review Draft Tasks | Gives detailed distribution report of incomplete 'Review Draft' tasks for the selected projects. |
84 | Forms - Distribution Report - Overdue Tasks | Gives detailed distribution report of overdue tasks for the selected projects. |
85 | Forms - Organization - Form Type Summary (Chart) | Displays a stack column chart with form types created by organizations for selected projects. |
86 | Forms - Organization Task Summary (Chart) | Displays a stack column chart with overall task status of organizations for selected projects. |
87 | Forms - Organizations - Tasks Completed (Chart) | Displays a pie chart with number of tasks completed by organizations for the selected projects. |
88 | Forms - Organizations - Tasks Incomplete (Chart) | Displays a pie chart with number of tasks incomplete by organizations for the selected projects. |
89 | Forms - Organizations - Tasks Overdue (Chart) | Displays a pie chart with number of overdue tasks of organizations for the selected projects. |
90 | Forms - Organizations - Tasks assigned (Chart) | Displays a pie chart with number of tasks assigned to organizations for the selected projects. |
91 | Forms - Status Summary | Shows the number of forms that are open grouped by their age. |
92 | Forms - Status Summary (Bar Chart) | Shows the number of forms that are open grouped by their type. |
93 | Forms - Task Status - (Chart) | Displays a pie chart with overall task status for forms i.e. count of all incomplete, overdue or cleared tasks for the selected project. |
94 | Forms - Users - Incomplete tasks (Chart) | Displays a column chart with number of incomplete tasks of users for the selected projects. |
95 | Forms - Users - Overdue tasks (Chart) | Displays a column chart with number of overdue tasks of users for the selected projects. |
96 | Forms Closed - Past 12 Months | Lists the forms that were closed in past 12 months. |
97 | Forms Closed Past 12 Months (Bar Chart) | Shows the number of forms that were closed in past 12 months. |
98 | Forms Closed Weekly Summary - Last 4 weeks | Shows weekly summary of forms closed in last 4 weeks. |
99 | Forms Closure Past 12 Months (Line Chart) | Shows the number of forms that were closed in past 12 months. |
100 | Forms Created - Organization-wise Trend in Past 12 Months (Line Chart) | Shows organization wise trend of forms created in past 12 months. |
101 | Forms Created - Past 12 Months | Shows all the forms that were created in past 12 months. |
102 | Forms Created - Project-wise Trend in Past 12 Months (Line Chart) | Shows project wise trend of the forms created in past 12 months. |
103 | Forms Created Group by Month in Past 12 Months (Bar Chart) | Shows total number of forms created in a month for past 12 months. |
104 | Forms Created Group by Organization in Past 12 Months (Bar Chart) | Shows total number of forms created by an organization in past 12 months. |
105 | Forms Created Group by Users in Past 12 Months (Bar Chart) | Shows total number of forms created by different users in past 12 months. |
106 | Forms Created Weekly Summary - Last 4 weeks | Shows weekly summary of forms created in last 4 weeks. |
107 | Forms Distribution - Lead Time for Past 12 Months | Shows the latency of open forms based on the distribution. |
108 | Forms Register | Gives basic form register along with its status. |
109 | Forms Tasks - All Tasks - (Chart) | Displays a pie chart with number of tasks by task type of forms for the selected projects. |
110 | Forms Tasks - Incomplete - (Chart) | Displays a pie chart with number of incomplete tasks by task type of forms for the selected projects. |
111 | Forms Task Status Summary - Past 12 Months (Bar Chart) | Shows the status of form task assigned, task completed late and task completed on time. |
112 | Forms Tasks - Overdue - (Chart) | Displays a pie chart with number of overdue tasks by task type of forms for the selected projects. |
113 | Organization - Upload Statistics Last 12 Months | Displays organization-wise files upload count of last 12 months for the selected projects. |
114 | Organization - Upload Trend in Past 12 Months (Chart) | Gives line chart view for monthly total number of uploads per organization for the selected projects. |
115 | Organization Activity - Past 12 Months(Chart) | Gives line chart view for monthly total number of activities per organization for the selected projects. |
116 | Organization Statistics Report | Shows the activity statistics of project. Users assigned as 'Workspace Administrator' on the project will be able to view the activity statistics report. |
117 | Project - Upload Statistics Last 12 Months | Displays project-wise files upload count of last 12 months for the selected projects. |
118 | Project - Upload Trend in Past 12 Months (Chart) | Gives line chart view for monthly total number of uploads per selected project. |
119 | Project Activity - Comment Created (Bar Chart) | Shows the number of aMessages made previous day, past week, past month, past 6 months and all time. |
120 | Project Activity - File Tasks Completed (Bar Chart) | Shows the number of file tasks completed previous day, past week, past month, past 6 months and all time. |
121 | Project Activity - Files Status Change (Bar Chart) | Shows the number of file status changes made on previous day, past week, past month, past 6 months and all time. |
122 | Project Activity - Files Task Assigned (Bar Chart) | Showing the number of tasks assigned on previous day, past week, past month, past 6 months and all time. |
123 | Project Activity - Files Uploaded (Bar Chart) | Shows the number of files uploaded on previous day, past week, past month, past 6 months and all time. |
124 | Project Activity - Form Tasks Assigned - (Bar Chart) | Shows the number of form tasks assigned on previous day, past week, past month, past 6 months and all time. |
125 | Project Activity - Forms Closed (Bar Chart) | Shows the number of forms closed on previous day, past week, past month, past 6 months and all time. |
126 | Project Activity - Forms Created - (Bar Chart) | Shows the number of forms created on previous day, past week, past month, past 6 months and all time. |
127 | Project Activity - Forms Task Completed (Bar Chart) | Shows the number of tasks completed on previous day, past week, past month, past 6 months and all time. |
128 | Project Activity - Past 12 Months (Chart) | Gives line chart view for monthly total number of activities per selected project. |
129 | Project Statistics Report | Shows the activity statistics of the project. Users assigned as 'Workspace Administrator' on the project will be able to view the activity statistics report. |
130 | Response Summary Report (Chart) | Shows the responses to a form. Additionally, a gauge shows open and closed statuses. |
131 | Transmittal Log - Extended Attributes | To get the customized configurable attributes in the report, you need to duplicate this report into your own folder, click on edit, add the required attribute columns and then run the report. This will fetch the configurable attributes which have been setup in the report. |
132 | User - Project Details | Displays a tabular report with project details for selected projects. |
133 | User - Task Statistics Report | Shows the task statistics of project users for selected projects. |
134 | User - Team Directory | Gives basic team directory report i.e. user details and role assignment details. |
135 | User - Upload Statistics Last 12 Months | Displays user-wise files upload count of last 12 months for the selected projects. |
136 | User Activity Report - All Inclusive | Shows all time user activity. |
137 | User Activity Report - Last 15 Day | Shows user activity during last 15 days. |
138 | User Activity Report - Last 24 Hours | Shows user activity during last 24 hours. |
139 | User Activity Report - Last 30 Day | Shows user activity during last 30 days. |
140 | User Activity Report - Last 7 Day | Shows user activity during last 7 days. |
141 | User Activity Report - Last Login | Shows user activity during last login. |
142 | User Activity Report - Past 12 Months | Shows user activity for past 12 months. |
143 | User Group Report | Displays information about users assigned to the user groups. |
144 | User Statistics Report | Shows the activity statistics of project users for previous month. Users assigned as 'Workspace Administrator' on the project will be able to view the activity statistics report. |
145 | User Statistics Report - Last Month | Shows the activity statistics of project users for previous month. Users assigned as 'Workspace Administrator' on the project will be able to view the activity statistics report. |
146 | User Statistics Report - Previous 30 days | Shows the activity statistics of project users for previous 30 days. Users assigned as 'Workspace Administrator' on the project will be able to view the activity statistics report. |
147 | User Status Report Till Last Month | Shows User status of all users of selected projects for previous month. |
148 | Users - New User Added Organization-wise Trend in Past 12 Months (Chart) | Shows new users added grouped by organization. |
149 | Users - New Users Added Group by Month in Past 12 Months (Chart) | Shows new users added grouped by month. |
150 | Users - New Users Added Group by Organization in Past 12 Months (Chart) | Shows new users added grouped by organization. |
151 | Users - New Users Added Last Month | Shows the list of new users added previous month for the selected projects. |
152 | Users - New Users Added Past 12 Months | Shows new users added in past 12 months. |
153 | Users - New Users Added Project-wise Trend in Past 12 Months (Line Chart) | Shows latency chart for new users added in past 12 months. |
Out-of-the-box Report Extension
Asite continues to extend the reporting module by including document hyperlinks in tabular reports wherein users can now directly view a particular document by simply clicking the document hyperlink in the tabular report. This feature is currently made available in below mentioned tabular reports:
Files - Document Distribution
Files - Export
Files - Export Last 12 Months
Files - Status History Report
Files - Transmittal Log - All Tasks
Files - Transmittal Log - Incomplete Tasks
Files - Transmittal Log - Overdue Tasks
Files Status Change - Past 12 Months
Files Transmittal - Tasks Completed Past 12 Months
Files Transmittal - Lead Time for Past 12 Months